The design of the outer rotor motor uses advanced materials and manufacturing processes to ensure its high quality and long life. It usually uses permanent magnet synchronous motor technology, which has high efficiency and precise control capabilities, and can meet various complex industrial needs. At the same time, the outer rotor motor also has good thermal characteristics and high temperature resistance, and is suitable for long-term operation in high temperature environments.
In general, outer rotor motors have become the preferred motor in various application scenarios due to their high efficiency, reliability and stability. Its advanced design and superior performance make it widely used in industrial production and household appliances. With the continuous advancement of technology and the growth of market demand, outer rotor motors will play an increasingly important role in future development.
●Operating Voltage: 40VDC
●No-load Performance: 12000RPM/5.5A
●Load Performance: 10500RPM/30A
●Rotation Direction: CW
●Core Material: SUS420J2
●Core Hardness: 50-55HRC
●High Post Test: AC500V(50HZ)/5mA/SEC
●Insulation Resistance:10MΩ/500V/1SEC
Selecting Robots, Robot Dog and etc.
Items |
Unit |
Model |
W6430 |
||
Rated voltage |
V |
40(DC) |
No-load speed |
RPM |
12000 |
Rated Speed |
RPM |
10500 |
Rotation Direction |
/ |
CW |
Core Hardness |
HRC |
50-55 |
Core Material |
/ |
SUS420J2 |
Insulation resistance |
MΩ Min/V |
10/500 |
High Post Test |
V/mA/SEC |
500(50HZ)/5 |
Our prices are subject to specification depending on technical requirements. We will make offer we clearly understand your working condition and technical requirements.
Yes, we require all international orders to have an ongoing minimum order quantity. Normally 1000PCS, however we also accept the custom made order with smaller quantity with higher expense.
Yes, we can provide most documentation including Certificates of Analysis / Conformance; Insurance; Origin, and other export documents where required.
For samples, the lead time is about 14 days. For mass production, the lead time is 30~45 days after receiving the deposit payment. The lead times become effective when (1) we have received your deposit, and (2) we have your final approval for your products. If our lead times do not work with your deadline, please go over your requirements with your sale. In all cases we will try to accommodate your needs. In most cases we are able to do so.
You can make the payment to our bank account, Western Union or PayPal: 30% deposit in advance, 70% balance before shipment.